Free Tool · Engineering Performance

Engineering Velocity Scorecard

Score your team across 7 DORA-aligned dimensions — deployment frequency, lead time, failure rate, recovery speed, planning, practices, and developer experience. Find where velocity is being constrained before it becomes a business problem.

28 scored
checks
7 velocity
dimensions
Free no sign-up
required
Example results
Seed startup — 6-person eng team
38 / 56
Good. Lead time and change failure rate are the primary drags. Fixing CI speed unlocks both.
Post-Series A — 20-person eng team
25 / 56
Developing. Deployment frequency and MTTR signal process debt that will compound as the team grows.
Scale-up — mature engineering org
51 / 56
High velocity. Estimation accuracy is the one area to sharpen before you double team size.
Rate each item

28 velocity checks

0 / 28
answered
Answer all 28 items to see your velocity band
Yes Part No
Total score
0
/ 56
0 / 28 items answered
Rate each item on the left to see your velocity band and category breakdown.
0 / 28
0 / 56